The cheapest quote can be the expensive choice.
Choose the work that protects margin.
Pull your own fuel, operator and machine cost per cubic metre (GHS 42/m³) directly alongside the subcontractor quote (GHS 49/m³) before you sign.
Darikoda connects the operating signal to the person who can act and the information needed to decide.
What happens next?
- Check the costs, output unit and period.
- Compare in-house output with the subcontract benchmark.
- Review availability, scope and assumptions before committing.
Who does what?
Compare in-house cost with a subcontract rate on the same basis. Check mobilisation, capacity and timing before choosing. Use utilisation and ownership costs when considering buy, rent or redeploy.
What information is needed?
Operating costs, output quantity and unit, comparison period, supplier rate, availability and scope.
How to read the result
For example, 1,250 cubic metres at GHS 42 costs GHS 52,500. At GHS 49 it costs GHS 61,250. The GHS 8,750 difference is illustrative and excludes any adjustments not in those rates.
How it fits what you already use
Accounts and quotations provide useful inputs. Bring operating costs and output onto the same basis before choosing who should do the work.
Free 30-minute conversation about your operation. Any further work is scoped and agreed separately.