Skip to main content

Darikoda · Sales and depot managers Ghana

Make the day add up at the door.

Follow the customer order through dispatch and delivery.

A field record signed by hand on a paper clipboard, the close-out Darikoda captures on a phone.Illustrative operating record

Follow the order beyond the sale.

  1. 01

    Order #4812

    120 cases booked

    Wholesale account · Tema Community 9 captured at 08:20

  2. 02

    Dispatch check

    105 cases loaded

    15 cases SKU-B out of stock at depot · flagged early

  3. 03

    Delivery close

    105 cases signed

    Back-order for 15 cases scheduled for Tuesday run

Illustrative example

At a glance

You run the field force. Darikoda gates the load-out against the account's credit, reconciles every consignment close-out at the van against cash, MoMo and cheque, and proves every drop with a photo, a signature and a location. Captured at source.

The platform, in your vocabulary

Three operational controls, running the field force.

01Control Engine

Load-out against the credit gate

The gate is at the load bay. An over-limit order holds for a decision before the van is loaded, so the exposure never leaves the depot on your route.

02Control Engine

Consignment close-out under a minute

Loaded, sold, returned, damaged, should-remain, counted, reconciled at the door and signed, with the cash panel matched to cash, MoMo and cheque. The over or the short is flagged before the agent leaves.

03Control Engine

Multi-drop routes with proof of delivery

Each drop carries a photo, a signature and a location. The manifest is not complete until the proof is attached to the drop. Dispute a delivery a week later and the photo, the signature and the spot it was left are already on the record.

What changes between paper and a signed record

Three moments in the day that stop landing on your desk as a surprise.

Three moments in the day that stop landing on your desk as a surprise.

Explore the scenariosKeep scrolling to see more ↓1 scroll moves on3 worked scenarios

06:30 morning load-out across 14 vans

Current state (Disconnected)

Orders are loaded together in the morning rush and credit limits are checked later in the office. An account already GHS 42,000 overdue gets another GHS 18,400 order loaded onto Van GV-114 before anyone notices.

With Darikoda (Connected operating record)

Each order meets the credit gate at the bay before a single case is loaded. Over-limit orders hold for MD release, and the dispatch gate holds the van RED until the load count and credit checks are GREEN.

14 vans gated pre-dispatch

the dispatch gate holds every van at the bay until load counts and credit limits are green.

17:40 evening close-out at the van door (480 vs 462 cases)

Current state (Disconnected)

A sales sheet and a cash bag reconciled from memory an hour later at a desk. Van GV-114 returns 18 cases short (480 loaded vs 462 accounted for at GHS 240/case), and the GHS 4,320 discrepancy lands on your desk to explain.

With Darikoda (Connected operating record)

Once physical returns are counted, digital reconciliation runs at the van door in under 60 seconds and is signed by the agent with PIN, matching cash, MoMo, and cheque against the stock count before the agent leaves.

Under 60 sec digital close-out

digital reconciliation after physical stock count so 18-case variances are named and signed at the van door.

Disputed 45-case drop (GHS 10,800) on a multi-drop route

Current state (Disconnected)

A supermarket buyer claims a 45-case drop (GHS 10,800 at GHS 240/case) on a 22-stop manifest arrived 12 cases short. Your only record is a pencil tick on a manifest, so you face a GHS 2,880 credit-note demand.

With Darikoda (Connected operating record)

Every drop carries a customer signature, carton photo, and GPS timestamp captured offline at the store entrance. Disputed deliveries are answered in 30 seconds with source-locked proof.

Drop POD photo & GPS-locked

photo, signature, and location locked on every stop so disputed shortage claims are reviewed against delivery evidence.

Illustrative scenarios, not published customer outcomes. Your audit checks your own records.

Where the day leaks

Six places the load-out, the route and the close-out lose stock and cash before they reach your desk.

  • Leak 01

    Load-out that goes out unchecked

    Without a gate at the bay, an order for an over-limit account is loaded with the rest and the exposure leaves the depot on your van. The credit call should happen before the keys are handed over, not in a reconciliation days later.

  • Leak 02

    A close-out done from paper an hour later

    The count that leaves and the count that comes back were never built to meet. Reconciled from a sheet at a desk, the short hides in the total and it lands on you.

  • Leak 03

    Deliveries you cannot prove

    The manifest says the drop was done. The customer says it never arrived. Without a photo, a signature and a location, the credit note gets written to keep the account, and it comes out of your day.

  • Leak 04

    A van that rolls before it is ready

    No gate on dispatch means a van leaves with the wrong stock, a bad count or an unresolved credit hold. The problem is found on the route, where it is expensive to fix.

  • Leak 05

    Returns, damages and empties that vanish

    Written on the back of a sheet and lost by the next morning, they become a variance nobody can explain at month-end.

  • Leak 06

    The reconciliation that lands on your desk

    Loaded, sold and collected have to add up, and you are the one who makes them. When they do not, you hear it first. Doing that from memory and a stack of paper is where the evening goes.

Want to see how fast your depot can close out 14 vans at the bay door?

30 minutes on WhatsApp maps your load-out, route Pod, and cash close-out gaps.

A dispatch record checked and signed by hand on a paper clipboard.
For the field force

A van does not roll until the check is green.

The dispatch gate holds the van at the depot until the credit hold, the count and the last close-out all clear. The problem is caught at the bay, not on the road.

Built so the record survives the route.

Your operating record faces the load bay, the road with no signal and the disputed drop. It is built to hold under all three.

  • Every load-out, sale, collection and drop is saved on the device first and syncs when the signal returns. No route waits for a network to record the day.
  • You can always see whether a van's close-out has reached the office yet. No wondering whether the numbers went through.
  • Every action is attributed to a person, a role, a device and a time. No silent edits to a close-out after it is signed.
  • Shared devices use PIN-level attribution, so every count carries its owner and no agent is logged in as another.
  • The dispatch gate holds a van until the check is green, so a bad count or an unresolved credit hold does not leave the depot.
  • Failed syncs from the field become visible issues, not silent gaps in the day's reconciliation.

Inside the first month

What a Darikoda month looks like running the field force.

From a gated load-out in week one to a field that records itself on every route.

A field record written up by hand on a paper clipboard.
From a gated load-out in week one to a close-out signed at the van and a field that records itself, signal or no signal.
  1. 01 / Week 1

    Load-out and dispatch gate go live

    Every order checked at the bay, every van held until the check is green. The exposure stops at the depot from the first morning.

  2. 02 / Week 2

    The close-out moves to the door

    The day's counts reconciled at the van and signed. The short stops landing on your desk from memory.

  3. 03 / Week 3

    Proof of delivery on every drop

    Photo, signature and location on each delivery. Disputed drops meet evidence instead of a tick on a printed sheet.

  4. 04 / Close of day

    One reconciled read

    An end-of-day summary of loaded against sold against collected, ready before anyone goes home.

  5. 05 / Every route

    The field records itself

    Offline-first capture means the day is written on the device and syncs when the signal returns. No route waits for coverage to record what happened.

Example operating cadence after activation. Rollout timing and acceptance criteria are agreed for your operation.

Field note from Darikoda

“The reconciliation happens where the work happens, not on your desk at night.”

The sales or depot manager is the one holding the day together. Load-out in the morning, routes running through places with no signal, close-out at night, and a reconciliation that lands on their desk whether or not the numbers were ever built to meet. We built the operating record so the reconciliation happens where the work happens. The credit check at the bay, the close-out signed at the door, the proof of delivery attached to the drop it belongs to, the day captured on the device even when the network is gone. The short does not vanish. What changes is where you meet it, and who is standing there when you do. Named at the van, by the person who ran it, while the stock and the cash are still in front of them.

Darikoda Systems Ltd

Founder-led, engineer-built. UCL MSc Mechanical Engineering. GE precision turbines. Four years inside Caterpillar and Unatrac heavy fleet operations across Ghana and Nigeria.

Sales and depot manager FAQ.

The questions other managers running a field force ask in the first call.

How fast is the close-out really?Read the answerClose answer

The close-out runs at the door. Every count is checked against the others, and a cash panel matches cash, MoMo and cheque to the count. The agent signs the result on the spot, so the reconciliation is done at the van, not rebuilt from paper at a desk an hour later.

What is on a proof of delivery?Read the answerClose answer

Each drop on a multi-drop route carries a photo, a signature and a location captured at the door. The manifest is not marked complete until the proof is attached to the drop it belongs to. When a delivery is disputed, the evidence is already on the record.

How does the dispatch gate decide GREEN or RED?Read the answerClose answer

The gate reads the checks that should clear before a van rolls: the credit hold on the order, the count against the load, the state of the close-out from the last route. You see a GREEN or RED status before the van is dispatched, so a bad count or an unresolved hold is caught at the depot rather than on the road. It is a status you check at dispatch, not a live tracker following the van.

Does it work with no signal on the route?Read the answerClose answer

Yes. Every load-out, sale, collection and drop is saved on the device first and syncs when the signal returns. The agent records the day as it happens, including at roadside counters with no coverage. Failed syncs surface as visible issues so nothing goes quietly missing.

Can the same device be used by different agents?Read the answerClose answer

Yes. Shared devices use PIN-level attribution, so each count and each close-out carries the agent who made it and no one is logged in as someone else. The record stays fair to the honest agent because it is always clear who did what.

Want the leakage map for your routes and close-outs?

30 minutes on WhatsApp. You keep the map regardless of next steps.

← Back to distribution operations overview

Patterns described here are drawn from extensive field audits and industry research across Ghana's distribution, mining, construction, and roadworks sectors. No specific operator is named or identifiable.