Darikoda
Book WalkthroughFree Leakage Map

Tippers queue. A loader sits idle elsewhere.

Put available capacity to work.

Spot that 6 tippers are queuing 40 minutes at Site A while your second wheel loader sits 70% idle at Site B 18 km away.

Darikoda connects the operating signal to the person who can act and the information needed to decide.

What happens next?

  1. See idle or underused assets across sites.
  2. Check work readiness and the actual bottleneck.
  3. Compare redeployment with hire and assign the next step.

Who does what?

Find the bottleneck before adding capacity. Check whether available plant can be moved and whether the receiving work is ready. Assign the readiness or redeployment decision.

What information is needed?

Machine availability, productive and idle hours, crew allocation, work readiness and site commitments.

How to read the result

An idle asset is a candidate for review. Transport, condition, access and commitments determine whether moving it helps.

How it fits what you already use

Schedules say what should happen. Utilisation and readiness show where capacity is available and what is stopping it from producing.

Try the outcome exampleGet Your Free 1-Page Leakage Map ↗ Calculate Fuel Bleed (60s) ↗

Free 30-minute conversation about your operation. Any further work is scoped and agreed separately.